OUR PROJECTS

We build projects that last

c2f0fce4aadb3851c4f060e1cc5bb670-g1-2_l_gal.jpg

 

AR Group was appointed to remove and replace sixty-nine failed fire rated glazing units as part of the wider refurbishment of the landmark G1 building.

 

Works included:

full survey of sizes and specifications

careful removal of failed units

the supply and installation of new Pyroguard fire rated glazing.

 

Specialist installation methods were used, including our Winlet glazing robot and rope access, with all works completed in accordance with RAMS and manufacturer standards.

G1, Glasgow

9-10-St-Andrew-Square-Serviced-Offices-Edinburgh-Building.png

AR Group was appointed by Sharkey to deliver a comprehensive façade and glazing package as part of the redevelopment of 9–10 St Andrew Square, a Category A-listed building in Edinburgh’s New Town.
Scope of works included secondary glazing, aluminium curtain walling and doors, stainless steel screens and doors, frameless glass doors and targeted window repairs across the building envelope.

St Andrew Square, Edinburgh

0_Hayweight-House.png

AR Group delivered a full glazing and façade package at Hayweight House as part of its conversion into a hotel. Works included curtain walling, windows, doors, high performance glazing and integrated fire stopping and insulation systems, coordinated closely with the principal contractor.

Hayweight House, Edinburgh

EQ-jaNDXsAMDppF.jpg

AR Group completed the replacement of forty four high level glazing units during term time at Leeds City College. Works were delivered within a live education environment of approximately 3,500 students using specialist access planning and controlled working arrangements.

Leeds City College

One-Life-Hartlepool-Medical-Centre_exterior_edited.jpg

 

AR Group completed a rooflight refurbishment and glazing replacement programme at One Life Medical Centre to address water ingress and improve system performance.
Scope included rooflight refurbishment, replacement of glazing and rooflight components and installation of new high performance glass units. Full access, lifting and on-site coordination were managed by our specialist team.

Hartlepool Medical Centre

MLA-GSD2-WEB-DavidCadzow-010-1600x1600_edited.jpg

AR Group completed high level glass replacements at 2 Semple Street. Works required road permits and full traffic management planning, with installation delivered using specialist access methods within a live commercial environment.

Semple Street, Edinburgh

AR Group Linkedin Post_edited.jpg

Mrs Tilly's Head Office, Larbert

AR Group designed, supplied and installed new aluminium windows to improve performance and appearance within the operational production environment.

Skypark-Exterior-1-1.png

Skyparks, Glasgow

AR Group undertook full engineering, design, supply and installation of a new back-up structure to accommodate existing granite cladding panels.

 

Works included the fabrication of new flashings and the coordination of interfaces with the existing building envelope.

Nicad-04.webp

Newcastle University

AR Group completed glass replacements to restore system performance and appearance, delivered safely within a live commercial environment.

banner-glasgow-office_edited.jpg

JP Morgan, Argyle St, Glasgow

AR Group completed glazing and cladding remedial works including glass replacements, cladding installation and specialist snagging. Works included CWCT water testing to verify system performance and weather tightness in accordance with required standards.

Screenshot 2026-01-26 223730.png

BoConcept,
Ingram St. Glasgow

AR Group completed a large-format glass replacement within a restricted-access retail environment. The works required specialist handling and installation techniques to manage weight, size and internal constraints safely.

e358ae4b096a1743e41b3be26c509c6a.jpg

Luna Place, Dundee

AR Group designed, supplied and installed two frameless structural glass entrance screens complete with new doors. Works included surveying, engineering of structural interfaces and installation within an operational retail setting.

lucent-50th-bothwell-street-glasgow.jpg

50 Bothwell Street, Glasgow

AR Group completed the design, supply and installation of curved cladding and flashings at 50 Bothwell Street. Additional snagging and remedial façade works were carried out to support overall building presentation and performance.

Edinburgh-Gin_Drone_case-study.jpg

Edinburgh Gin Distillery, Edinburgh

AR Group completed remedial door alterations, snagging works and minor repairs to support operational performance and durability at the Edinburgh Gin premises.

entrance_view_engineering_module_1_-_small.jpg

School of Engineering, The University of Edinburgh

AR Group completed 2,112m² of brick slip pointing works to support performance and aesthetic refurbishment of the building façade.